Mutangi Dam | |||||||
Method | C (2000) (m3) | CC (m3) | CL (%) | SV (m3·yr−1) | DS (m3) | RS (t·yr−1) | ASY (t·ha−1·yr−1) |
Hydrographic | 154,000 | 96,641 | 37.3 | 3415.9 | 8 | 8539 | 14.5 |
Grab sampling | 154,000 | 92,800 | 39.7 | 3644.3 | 8 | 9110 | 15.4 |
Water level | 154,000 | 98,440 | 36.1 | 3306.3 | 8 | 8265 | 14 |